Monday, October 20, 2008

Schedule Update

The General Contractor is site grading the parking lot. What that means is that they are cutting the dirt down to subgrade, or the level below what makes up the parking lot. The parking lot will be paved with bricks, but beneath those bricks is 18" of stone.

The Concrete Contractor is now on site placing all the curb that goes throughout the parking lot. That's going to be about 1000 Feet of curb! They're moving pretty quickly, though, and should knock most of it out this week and next.

The Electrical Contractor is constantly in and out of the site, placing conduit and wiring wherever available.

Friday, October 3, 2008

Dumpster Enclosure

These brick workers really work fast! None of those bricks were there this morning, and two hours later they have another 4 rows in place! This is the back side (Palmer Ct Side) of the new Dumpster Enclosure. Access to the dumpsters will be through a small gated door on the Palmer Ct side and from the front/parking lot side, which is entirely opened, save for a rolling gate.